Action plan · all proposals
Proposed by Facts Count
Join up safe cycle routes across Portsea Island
Check how the city’s cycle routes, new crossings and rebuilt seafront paths connect, publish the gaps and dangerous junctions, and fix the most important ones in order, measuring use and safety before and after.
In five minutes
- The evidence
Adults who cycle at least once a week (any purpose): 13.3% (England 10.1%) (Year to November 2023), Portsmouth.
Issue: Air pollution and traffic. Related findings: “Shore power can cut emissions while ships are berthed”, “Flood protection needs delivery and maintenance”, “Improved public spaces can benefit more residents”.
- Proposed by
Proposed by Facts Count A proposal, not a council decision or commitment.
- Proposed lead
- Portsmouth City Council (proposed; as local highway and transport authority)
- Cost and funding
- Not costed · no funding identified. EstimateAllocatedSpentUnknown
- First move
- Publish a simple map showing which existing and newly built cycle routes connect and where they stop, using records the council already holds.
- Success measure
- A published map of continuous links meeting national design guidance, with gaps and unsafe junctions named and a dated programme to fix them; more people cycling; and fewer cyclist and pedestrian casualties per trip. No numeric target is proposed until a usage baseline is agreed.
Suggested stages
A proposed sequence, not deadlines or funded commitments. Starting an action is not the same as its benefits arriving.
Start soon
- Map existing and committed cycle routes, including completed seafront frontages, and list gaps and junctions where routes break.Lead: Portsmouth City Council transport planningOutput: Published connectivity map and gap list
- Check collision locations for cyclists and pedestrians over five years at each listed junction.Lead: Portsmouth City Council road safetyOutput: Junction risk table using consistent yearsDepends on: STATS19 data for 2021–2025
- Feed the gap list into the Walking and Cycling Strategy being drafted in 2026.Lead: Portsmouth City CouncilOutput: Priority list in the strategy
Build next
- Appraise route options, including a seafront and Hilsea link, for cost, safety, access, pedestrian conflict, land ownership and maintenance.Lead: Portsmouth City Council with Active Travel EnglandOutput: Options appraisal with cost rangesDepends on: Gap list; land ownership checks
- Install counters on candidate links before works start.Lead: Portsmouth City CouncilOutput: Usage baseline per link
Longer term
- Deliver prioritised links as funding allows and publish before-and-after counts and casualty data.Lead: Portsmouth City CouncilOutput: Completed links and published evaluation
Why, and the trade-off
Portsmouth has more people cycling each week than the England average, but the share fell between 2016 and 2023. New routes are being added in pieces: corridor schemes, crossings, and a two-way cycle path along each rebuilt seafront section. The city has no published check of whether these pieces join into continuous, safe routes. Police-reported cyclist casualties have fallen, but over 100 cyclists are still hurt each year, and casualty counts alone do not show risk.
Trade-off: People without cars, young people and those on low incomes could gain most from safe routes. Disabled people may gain or lose depending on design, kerbs and shared-path rules. Drivers may face slower journeys at some junctions.
Related projects: Southsea Coastal Scheme, Hilsea Lines moat restoration and sea defences, Linear Park and Hilsea Lido
Baseline Adults who cycle at least once a week (any purpose): 13.3% (England 10.1%) (Year to November 2023); Police-reported pedal cyclist casualties: 121, of which 27 killed or seriously injured (unadjusted) (2025); Severity-adjusted killed or seriously injured pedal cyclists, three-year average: 24.0 a year (2023–2025); 34.9 a year (2016–2018) (2016–2018 and 2023–2025); Active travel funding allocated by DfT and Active Travel England: £1,276,988 over 2026/27–2029/30 (2026/27 to 2029/30); Completed safe links on a connected network: Not established (—)
Full appraisal
Problem, options against the current approach, costs, risks, who gains and who pays, and how progress would be judged.
Full delivery plan: problem, options, costs, risks and how to judge progress
The problem and who is affected
Portsmouth has more people cycling each week than the England average, but the share fell between 2016 and 2023. New routes are being added in pieces: corridor schemes, crossings, and a two-way cycle path along each rebuilt seafront section. The city has no published check of whether these pieces join into continuous, safe routes. Police-reported cyclist casualties have fallen, but over 100 cyclists are still hurt each year, and casualty counts alone do not show risk.
Who is affected: People who cycle or would like to, including commuters, students, children travelling to school and disabled people using adapted cycles. Pedestrians who share paths. Residents near busy junctions. Drivers and bus users where road space changes.
| Measure | Value | Period | Area |
|---|---|---|---|
| Adults who cycle at least once a week (any purpose) Survey-based (Active Lives). Confidence interval about ±3.7 points. Last DfT edition. | 13.3% (England 10.1%) | Year to November 2023 | Portsmouth |
| Police-reported pedal cyclist casualties | 121, of which 27 killed or seriously injured (unadjusted) | 2025 | Portsmouth, all roads |
| Severity-adjusted killed or seriously injured pedal cyclists, three-year average | 24.0 a year (2023–2025); 34.9 a year (2016–2018) | 2016–2018 and 2023–2025 | Portsmouth, all roads |
| Active travel funding allocated by DfT and Active Travel England | £1,276,988 over 2026/27–2029/30 | 2026/27 to 2029/30 | Portsmouth |
| Completed safe links on a connected network No continuity audit has been published. | Not established | — | Portsea Island |
What this would change
Aim: Join existing and planned cycle routes, including the new seafront paths, into a connected network that people of different ages and abilities can use safely, starting with the gaps and junctions that matter most.
What success would mean: A published map of continuous links meeting national design guidance, with gaps and unsafe junctions named and a dated programme to fix them; more people cycling; and fewer cyclist and pedestrian casualties per trip. No numeric target is proposed until a usage baseline is agreed.
The council would audit how the LCWIP corridors, recent schemes and the seafront cycle paths connect, and publish a gap and junction list. It would appraise route options, including a seafront and Hilsea link, against cost, safety, accessibility, pedestrian conflict, land ownership and maintenance. The forthcoming Walking and Cycling Strategy would set the priority order. Schemes would use the existing active travel allocation and implementation plan, with counting before and after each scheme.
Proposed lead: Portsmouth City Council (proposed; as local highway and transport authority). Partners: Active Travel England (funder), Southsea Coastal Scheme team, Portsmouth Cycle Forum and disability groups (already consulted on schemes), Sustrans (National Cycle Network routes), Hampshire and the Solent Combined Authority (future funding route).
Powers: The council is the local transport authority with a statutory Local Transport Plan (ltp4-amr-2026) and delivers schemes on roads it manages. Roads managed by National Highways are outside its control (ras0403 notes). Active Travel England allocates funding (ate-alloc-2026-30). Seafront works are delivered through the council-led Southsea Coastal Scheme, so cycle design there is tied to flood-defence approvals (scs-booklet-oct26). Land outside the highway, such as parks or Ministry of Defence land, needs owner agreement; ownership was not checked.
Options
Further appraisal may change the choice because route lengths, junction costs, land ownership and expected use have not been measured, and the available active travel allocation (about £258,000 capital a year) is small relative to major junction works.
Delivery plan
| Stage | Task | Proposed lead | Dependencies and decisions | Output |
|---|---|---|---|---|
| Start soon | Map existing and committed cycle routes, including completed seafront frontages, and list gaps and junctions where routes break. | Portsmouth City Council transport planning | — | Published connectivity map and gap list |
| Start soon | Check collision locations for cyclists and pedestrians over five years at each listed junction. | Portsmouth City Council road safety | Depends on: STATS19 data for 2021–2025 | Junction risk table using consistent years |
| Start soon | Feed the gap list into the Walking and Cycling Strategy being drafted in 2026. | Portsmouth City Council | Decision: Strategy consultation | Priority list in the strategy |
| Build next | Appraise route options, including a seafront and Hilsea link, for cost, safety, access, pedestrian conflict, land ownership and maintenance. | Portsmouth City Council with Active Travel England | Depends on: Gap list; land ownership checks | Options appraisal with cost ranges |
| Build next | Install counters on candidate links before works start. | Portsmouth City Council | — | Usage baseline per link |
| Longer term | Deliver prioritised links as funding allows and publish before-and-after counts and casualty data. | Portsmouth City Council | Decision: Funding approval per scheme | Completed links and published evaluation |
A first practical step: Publish a simple map showing which existing and newly built cycle routes connect and where they stop, using records the council already holds.
Costs and funding
- One-off costs
- Not costed. The connectivity audit and options appraisal need a staff or consultant estimate. Construction costs depend on the chosen links.
- Recurring costs
- Not costed. Surface, lighting, signs and counter maintenance would add to highway maintenance budgets.
- Capital or revenue
- Both: capital for construction; revenue for planning, counting and promotion.
- Funding status
- Existing allocations: £258,433 capital a year (4 years) and £81,085 revenue a year (3 years) from DfT and Active Travel England for 2026/27–2029/30; £419,974 in 2025/26. These cover all active travel work, not this proposal. The coastal scheme budget is for flood defence.
- Affordability
- Not assessed. The allocation is small compared with major junction redesigns, so priorities would be needed.
- Costing still needed
- Cost the audit; then cost each candidate link with unit rates from recent Portsmouth schemes such as Lake Road and the East-West corridor, including maintenance.
Benefits, risks and trade-offs
Possible benefits: Safer, more connected routes could make cycling practical for more people, reduce car trips and support health. Benefits are not quantified.
Risks:
- Junction changes may reduce road capacity and slow buses or traffic, causing opposition.
- Shared paths on the seafront can cause conflict between cyclists and pedestrians, especially at busy times.
- Funding is small and spread across all active travel work.
- Coastal construction dates may slip, delaying seafront links.
- Survey estimates are imprecise, so small changes in cycling may not be detectable.
Who could gain or lose: People without cars, young people and those on low incomes could gain most from safe routes. Disabled people may gain or lose depending on design, kerbs and shared-path rules. Drivers may face slower journeys at some junctions.
Environment: More cycling could reduce car traffic and emissions. Construction on the seafront and at Hilsea interacts with protected habitats and heritage, handled through existing coastal scheme approvals.
Capacity: The council reports recent recruitment of project managers but also delays to internally funded schemes from resource constraints.
How to judge progress
| Measure | Definition | Starting point | Source and area | How often · who reports |
|---|---|---|---|---|
| Adults cycling at least once a week | Active Lives Survey estimate, any purpose, adults aged 16 and over | 13.3% (year to Nov 2023, ±3.7) Gap: Later years published only by Sport England; reuse terms not confirmed, so link rather than republish | DfT CW0302 (to 2023); Sport England Active Lives from 2024 · Portsmouth | Annual · Sport England (publisher) |
| Pedal cyclist casualties, killed or seriously injured (severity-adjusted) | Police-reported casualties, three-year rolling average | 24.0 a year (2023–2025) | DfT RAS0403 · Portsmouth, all roads | Annual · Department for Transport |
| Completed connected links | Kilometres and junctions on the agreed network meeting national cycle design guidance | Not established Gap: Network and standard not yet defined | Proposed council connectivity audit · Portsea Island | Annual · Portsmouth City Council (proposed) |
| Cycle counts on improved links | Average daily cycle flows from permanent and temporary counters, before and after works | Not established for most links Gap: Counts not routinely published | Council Vivacity cameras and new counters · Scheme links | Before, at 6 months and at 2 years (current council practice) · Portsmouth City Council |
Reassess when: Reassess when the Walking and Cycling Strategy is published for consultation, when the 2026/27–2029/30 implementation plan or Local Transport Delivery Plan is read, and when each coastal frontage opens.
Where things stand
What is known:
- The LCWIP was approved in February 2022 and focuses on commuter corridors.
- Several schemes have been built since, including Lake Road and the East-West corridor.
- Rebuilt seafront frontages include two-way cycle paths.
- Portsmouth has a defined active travel allocation for 2026/27–2029/30.
- Cyclist casualties and weekly cycling both fell between 2016 and the latest years.
What is not known:
- Whether completed sections join into continuous safe routes.
- The length and cost of any circuit or missing links.
- Land ownership on candidate links off the highway.
- Cycle usage on most routes.
- What the July 2026 implementation plan and Local Transport Delivery Plan allocate to cycling.
- Whether e-scooters and e-bikes change risk; the Other vehicle casualty category has risen.
Decisions needed:
- Whether to commission a connectivity audit.
- Whether the Walking and Cycling Strategy should include a seafront and Hilsea link or circuit.
- How to split the active travel allocation between corridors and connecting links.
Existing work:
- Local Cycling and Walking Infrastructure Plan (adopted document titled 2021–2031): Approved 24 February 2022 (as of 2022-02-24).
- Walking and Cycling Strategy: In development during 2026 (as of 2026-09-17).
- Southsea Coastal Scheme cycle paths: Frontage 3 open (April 2026); Frontage 5 East due spring 2027; Frontage 6 due late summer 2028 (as of 2026-10).
- LTP4 implementation plan active travel schemes: 2026/27 plan approved March 2026; replaced by a four-year plan in July 2026 (as of 2026-09-17).
- North Portsea Coastal Scheme final phase: Works until end of 2026 (as of 2026-11-02).
Next review: When Portsmouth publishes its Walking and Cycling Strategy for consultation, or when DfT publishes 2026 casualty data (expected July 2027).. Evidence last checked 2026-11-02.
Sources
Local Walking and Cycling Infrastructure Plan 2020–2030: decision and minutes, Cabinet Member for Traffic and Transportation, 24 February 2022 ↗ · Local Cycling and Walking Infrastructure Plan 2021–2031 (Appendix B, LCWIP Summary FINAL, adopted 24 February 2022) ↗ · Local Transport Plan 4 Annual Monitoring Report 2025/26 (Cabinet Member for Transport, 17 September 2026) ↗ · Local Transport Plan 4 – Implementation Plan 2026/2027 (Cabinet Member for Transport, 19 March 2026) ↗ · Active travel local transport authority allocations (2026/27 to 2029/30) ↗ · Consolidated Active Travel Fund: final allocations (2025 to 2026) ↗ · RAS0403: Reported road collision and casualty numbers and rates by severity, road user type and local authority, 10 years up to 2025 ↗ · CW0302: Proportion of adults who cycle, by purpose, frequency and local authority, England, November 2015 to November 2023 ↗ · Walking and cycling statistics (collection page) ↗ · Active Lives adult data ↗ · Southsea Coastal Scheme booklet, October 2026 ↗ · Portsmouth City Council response to the Inspectors’ questions, Matter 2: housing need and requirement (M2.01) ↗ · Council: Hilsea Lines, reopened lido and coastal works ↗ · UK Facts live: Portsmouth action plan (legacy ten suggestions) ↗Where earlier ideas went
- cycle-circuit (earlier ten suggestions): restored. cycle-connections (circuit kept as an alternative option) Not carried forward: The 12km length, mid-single-digit millions cost, 3–7 year timescale, Solent Transport funding route and the one-main-road claim were dropped as unverified. The evidence attributed to the Development Plan was a UK Facts page, not a council assessment.
Sources
- Local Walking and Cycling Infrastructure Plan 2020–2030: decision and minutes, Cabinet Member for Traffic and Transportation, 24 February 2022 checked 2026-11-02
- Local Cycling and Walking Infrastructure Plan 2021–2031 (Appendix B, LCWIP Summary FINAL, adopted 24 February 2022) checked 2026-11-02
- Local Transport Plan 4 Annual Monitoring Report 2025/26 (Cabinet Member for Transport, 17 September 2026) checked 2026-11-02
- Local Transport Plan 4 – Implementation Plan 2026/2027 (Cabinet Member for Transport, 19 March 2026) checked 2026-11-02
- Active travel local transport authority allocations (2026/27 to 2029/30) checked 2026-11-02
- Consolidated Active Travel Fund: final allocations (2025 to 2026) checked 2026-11-02
- RAS0403: Reported road collision and casualty numbers and rates by severity, road user type and local authority, 10 years up to 2025 checked 2026-11-02
- CW0302: Proportion of adults who cycle, by purpose, frequency and local authority, England, November 2015 to November 2023 checked 2026-11-02
- Walking and cycling statistics (collection page) checked 2026-11-02
- Active Lives adult data checked 2026-11-02
- Southsea Coastal Scheme booklet, October 2026 checked 2026-11-02
- Portsmouth City Council response to the Inspectors’ questions, Matter 2: housing need and requirement (M2.01) checked 2026-11-02
- Council: Hilsea Lines, reopened lido and coastal works checked 2026-10-17
- UK Facts live: Portsmouth action plan (legacy ten suggestions) checked 2026-11-02