Skip to content
Facts CountEdition: PortsmouthChange place
or browse all wards

Find your area

Sewage and the sea · Sewage spills and flood defences

Sewage in the waters around Portsmouth

In 2025, storm overflows into Portsmouth Harbour, Langstone Harbour and the Southsea and Eastney coast were counted as spilling 443 times, for 1,848 outfall-hours. That is 37% fewer counted spills than in 2024; the highest year since 2020 was 2023 (840). Rain drives spills, so one year’s fall does not show a lasting change.

2020 is incomplete: 17 of 48 outfalls have no spill count, so its total is too low to compare directly. The same-outfalls series below avoids this.

48 monitored outfalls in these waters. Counted with the Environment Agency’s 12/24-hour method; checked 2026-11-10. These records show how long overflows discharged, not how much.

Where sewage is discharged, and what the water tests show. Explore monitored outfalls, discharge frequency and duration, and the official tests at nearby bathing waters. These measures show different parts of the evidence.

Recorded spill counts across 48 outfalls, 2025

443

Counted with the 12/24-hour method. Several outfalls spilling at once each add to the count, so this is not the number of separate events in the city.

Summed spill duration, 2025

1,848 outfall-hours

Hours added up across outfalls. It is not the time the water was polluted, and it is not a volume. Monitors recorded 97.9% of the year on average.

Bathing-water classification (official annual result)

  • Southsea East: Poor (2025)
  • Eastney: Good (2025)

Based on four seasons of samples. A measured result is a different thing from a recorded discharge.

What this tells us, and what it cannot

What this tells us

  • Which monitored outfalls discharged, how often, and for how long, each year since monitoring was reported.
  • What the official tests measured at named beaches, and how each beach was classified.
  • Where the monitoring is incomplete, so a total is not read as a trend.

What it cannot tell us

  • How much sewage was released: the records give duration, not volume.
  • That a discharge caused a poor test result, or that a beach is safe because no discharge was recorded.
  • That anyone became ill. No illness count for Portsmouth beaches is published, so none is shown.
  • That a spill was illegal: permits allow discharges in set conditions.

Spills and duration by year

All Portsmouth waters first, then each water. The last column keeps the same outfalls in every year, so more monitors cannot make the trend look worse.

The first two charts add up every outfall listed each year, so they change when monitors are added. The last two use only the outfalls with a reading in every year. Missing years are shown as gaps, not zero.

All Portsmouth waters: Portsmouth Harbour, Langstone Harbour, Southsea and Eastney coast
YearCounted spillsOutfall-hoursOutfalls listedAverage monitor coverageOutfalls under 90% coverageSame 31 outfalls every year: spills
20205613,34048 (17 without a count)96.7%3561
20215832,5204896.8%2518
20226202,8864897.6%4505
20238405,2924896.7%2669
20247064,2244896.1%5532
20254431,8484897.9%3378
Portsmouth Harbour 288 counted spills in 2025 · 40 outfalls

The harbour and the creeks, lakes and rivers named as draining to it: Fareham Creek, Frater Lake, Workhouse Lake, Ports Creek and the Wallington.

338202039420214292022572202345820242882025
Portsmouth Harbour
YearCounted spillsOutfall-hoursOutfalls listedAverage monitor coverageOutfalls under 90% coverageSame 25 outfalls every year: spills
20203381,34640 (15 without a count)96.1%3338
20213941,0524096.2%2331
20224291,3734097.9%3316
20235722,7374096.1%2401
20244581,9774095.8%4285
20252886874097.6%3223
Langstone Harbour 17 counted spills in 2025 · 6 outfalls

The harbour, its channels and lakes on the Portsea Island side (Broom Channel, Great Salterns Lake), and the Hermitage Stream and Brockhampton Creek in Havant.

352020212021372022442023302024172025
Langstone Harbour
YearCounted spillsOutfall-hoursOutfalls listedAverage monitor coverageOutfalls under 90% coverageSame 4 outfalls every year: spills
202035956 (2 without a count)99.7%035
202121546100%019
20223773694.8%135
202344143699.9%044
20243071697%129
20251733699.8%017
Southsea and Eastney coast 138 counted spills in 2025 · 2 outfalls

The Solent off Southsea and Eastney, including the Eastney long sea outfall from the Budds Farm treatment works, which serves Havant and Portsmouth.

188202016820211542022224202321820241382025
Southsea and Eastney coast
YearCounted spillsOutfall-hoursOutfalls listedAverage monitor coverageOutfalls under 90% coverageSame 2 outfalls every year: spills
20201881,898299.8%0188
20211681,415298.5%0168
20221541,4402100%0154
20232242,4122100%0224
20242182,176299.8%0218
20251381,128298.5%0138
Wider Solent 1,986 counted spills in 2025 · 138 outfalls

Every Southern Water storm overflow whose outlet lies between easting 440,000 and 480,000 and northing 90,000 and 112,000: the Solent coast from Southampton Water to Chichester Harbour, the north-east Isle of Wight and the rivers and streams that drain to them.

2,18520202,33520212,23820223,82620233,16220241,9862025
Wider Solent
YearCounted spillsOutfall-hoursOutfalls listedAverage monitor coverageOutfalls under 90% coverageSame 93 outfalls every year: spills
20202,18516,791138 (44 without a count)97%52,135
20212,33513,739138 (1 without a count)96.1%82,095
20222,23815,280138 (3 without a count)96.2%92,027
20233,82635,29013896.5%133,316
20243,16224,08213896.9%102,693
20251,98610,99113897.4%101,732

Map and outfall detail

Every monitored outfall in these waters, with its spills each year. A dash is a gap, not zero.

Portsmouth HarbourLangstone HarbourSouthsea and Eastney coastBathing-water sampling point

Circles are outfalls, sized by the selected measure and year on one scale; hollow circles had no count. Diamonds are the sampling points of Portsmouth’s bathing waters. Positions are approximate (outfall grid references in the returns). Shaded shapes are Portsmouth’s wards, for orientation; some outfalls are outside the council boundary. Nearness does not show that an outfall affected a beach. Monitoring coverage differs by outfall and year: see the table.
48 outfalls
OutfallWater202020212022202320242025TrendCoverage 2025
Budds Farm Havant Wtw · permit A00753Langstone Harbour · Langstone Harbour310122413999.8%
Budds Farm Havant Wtw · permit A00752Langstone Harbour · Brockhampton Creek41785399.5%
St Andrews Road Portsmouth Cso · permit A01277 · outlet location changedLangstone Harbour · Broom Channel222425399.9%
Kirtley Close Drayton Cso · permit A01387Langstone Harbour · Langstone Harbour66121062100%
Burrfields Road Portsmouth Cso · permit A01386Langstone Harbour · Great Salterns Lake—21000100%
Priorsdean Crescent Havant Cso · permit A01016Langstone Harbour · Hermitage Stream—0101099.7%
Gladys Avenue Portsmouth Cso · permit W00279 · 4 overflowsPortsmouth Harbour · Portsmouth Harbour—345663694385%
Pier Road Southsea Cso · permit W00278Portsmouth Harbour · Portsmouth Harbour59354221304350.4%
North End Avenue Portsmouth Cso · permit A01275Portsmouth Harbour · Portsmouth Harbour11304657493199.7%
Fareham Road Gosport Outside 359 Cso · permit H01635 · outlet location changedPortsmouth Harbour · Portsmouth Harbour30334177292699.7%
Court Lane Cosham Sso · permit A00657Portsmouth Harbour · Ports Creek51418171922100%
Mile End Road Portsmouth No 2 Cso · permit A00973Portsmouth Harbour · Portsmouth Harbour6231210211899.7%
Arundel Drive Fareham Cso · permit H01139Portsmouth Harbour · Trib Of Portsmouth Harbour2116161791499.7%
High Street Fareham Cso · permit A01050Portsmouth Harbour · Wallington River—1847928512100%
Mainland Drayton Sso · permit A00656Portsmouth Harbour · Ports Creek16152223151199.9%
Southwick Sso · permit W00248Portsmouth Harbour · River Wallington99133735999.5%
Grove Road Gosport Ceo · permit A01362Portsmouth Harbour · Portsmouth Harbour1933241818899.7%
Foster Road Gosport Ceo · permit A01375Portsmouth Harbour · Workhouse Lake, Portsmouth Hbr91312126699.9%
Quay Street Fareham Cso · permit A00334Portsmouth Harbour · Fareham Creek/Portsmouth Hbr2319223011599.7%
Wicor Mill Lane Portchester Ceo · permit A01374Portsmouth Harbour · Portsmouth Harbour142541565100%
Widley Road Portsmouth Cso · permit A01279Portsmouth Harbour · Portsmouth Harbour191711107599.7%
Bury Road Gosport Ceo · permit A01382Portsmouth Harbour · Workhouse Lake—10544100%
Mile End Road Portsmouth No 1 Cso · permit A00971Portsmouth Harbour · Portsmouth Harbour1815417499.7%
Salterns Lane Fareham Ceo · permit A01393Portsmouth Harbour · Portsmouth Harbour432014100%
Cambridge Road Gosport Ceo · permit A01357Portsmouth Harbour · Portsmouth Harbour—73553100%
Fareham Road Gosport Outside 68 Cso · permit A01361Portsmouth Harbour · Frater Lake532121399.7%
Newmans Bridge Southwick Ceo · permit A01308Portsmouth Harbour · River Wallington23543399.9%
Brewers Lane Gosport Cso · permit A01207Portsmouth Harbour · Frater Lake, Portsmouth Hbr12270299.7%
Wickham Road Fareham Cso · permit A01453 · outlet location changedPortsmouth Harbour · River Wallington225127299.6%
Alver Road Gosport Ceo · permit A01391Portsmouth Harbour · Workhouse Lake10044199.9%
Cow Lane Portchester Ceo · permit A01383Portsmouth Harbour · Portsmouth Harbour—03111100%
Harbour Road Gosport Cso · permit A01365Portsmouth Harbour · Portsmouth Harbour—1001199.7%
Lone Valley Waterlooville Cso · permit A01017Portsmouth Harbour · Tributary Of River Wallington—0000182.4%
Salterns Lane Fareham Outside 12 Cso · permit A01380Portsmouth Harbour · The Portsmouth Harbour320011100%
Bridgefoot Fareham Ceo · permit A00201Portsmouth Harbour · Fareham Creek/Portsmouth Hbr1464960100%
Cams Hill Fareham Cso · permit A00332Portsmouth Harbour · Fareham Creek/Portsmouth Hbr4311860099.9%
Hardway Ceo · permit A01366Portsmouth Harbour · Portsmouth Harbour—13220100%
Holbrook Road Portsmouth Cso · permit A00357Portsmouth Harbour · Portsmouth Harbour—0000099.7%
Lees Lane Gosport Ceo · permit A01368Portsmouth Harbour · Portsmouth Harbour—00000100%
Middlecroft Lane Gosport Cso · permit A01447Portsmouth Harbour · Portsmouth Harbour10120099.7%
Mumby Road Gosport Ceo · permit A00350Portsmouth Harbour · Portsmouth Harbour—0002099.5%
Ramblers Way Waterlooville Ceo · permit A01276Portsmouth Harbour · Unnamed Trib Of R. Wallington—1011092%
St Matthews Square Gosport Ceo · permit A01454Portsmouth Harbour · Portsmouth Harbour—0000099.7%
The Anchorage Gosport Ceo · permit A01371Portsmouth Harbour · Portsmouth Harbour—0123099.9%
Wallington Hill Fareham Cso · permit H01049Portsmouth Harbour · River Wallington—0000099.7%
Westbrook Grove Purbrook Ceo · permit A01278Portsmouth Harbour · Wallington River Via Drain320000100%
Budds Farm Havant Wtw · permit A00754Southsea and Eastney coast · The Solent1041041021391248697.5%
Budds Farm Havant Sso · permit A00751 · outlet location changedSouthsea and Eastney coast · The Solent/Langstone Harbour84645285945299.5%

Not counted here: outfalls into Black Brook, Blackbrook Stream, Ditch To The River Alver, Hayling Bay, Hoeford Lake, Hoeford Stream, Saline Estuary, Sheepwash Tributary, Stoke Lake, The Potwell Tributary. Their route to these waters is not stated in the returns, so they are kept out of the Portsmouth totals until reviewed. They are in the wider Solent figures.

Beaches and shellfish

Official water results, kept separate from spill counts. A spill and a poor result nearby do not by themselves show that one caused the other.

Southsea East bathing water

  1. 2017 Excellent
  2. 2018 Excellent
  3. 2019 Excellent
  4. 2021 Good
  5. 2022 Sufficient
  6. 2023 Poor
  7. 2024 Poor
  8. 2025 Poor

Each year’s class uses samples from the previous four seasons (latest: 2022-05-03 to 2025-09-16). Environment Agency profile ↗

Eastney bathing water

  1. 2017 Excellent
  2. 2018 Excellent
  3. 2019 Excellent
  4. 2021 Excellent
  5. 2022 Excellent
  6. 2023 Good
  7. 2024 Good
  8. 2025 Good

Each year’s class uses samples from the previous four seasons (latest: 2022-05-03 to 2025-09-16). Environment Agency profile ↗

Hayling Eastoke bathing water

  1. 2017 Excellent
  2. 2018 Excellent
  3. 2019 Excellent
  4. 2021 Excellent
  5. 2022 Excellent
  6. 2023 Excellent
  7. 2024 Excellent
  8. 2025 Excellent

Each year’s class uses samples from the previous four seasons (latest: 2022-05-03 to 2025-09-08). Environment Agency profile ↗

Hayling Beachlands Central bathing water

  1. 2017 Excellent
  2. 2018 Excellent
  3. 2019 Excellent
  4. 2021 Excellent
  5. 2022 Excellent
  6. 2023 Excellent
  7. 2024 Excellent
  8. 2025 Excellent

Each year’s class uses samples from the previous four seasons (latest: 2022-05-03 to 2025-09-08). Environment Agency profile ↗

Hayling Beachlands West bathing water

  1. 2017 Excellent
  2. 2018 Excellent
  3. 2019 Excellent
  4. 2021 Excellent
  5. 2022 Excellent
  6. 2023 Excellent
  7. 2024 Excellent
  8. 2025 Excellent

Each year’s class uses samples from the previous four seasons (latest: 2022-05-03 to 2025-09-08). Environment Agency profile ↗

Measured results at the beaches

Results in colony-forming units (cfu) per 100 ml, from in-season sampling to 2026-09-21. The 2026 season is not yet classified. Samples the Environment Agency marks discountable (abnormal situations) are kept and labelled.

Southsea East

101001,00010,000‘Good’ limit 500 (a percentile, not one sample)2023202420252026

Each dot is one sample day. Hollow dots are below the laboratory detection limit (shown at the lowest tick). The Environment Agency says water quality here can be affected by heavy rain. Official profile and live status ↗

Table of results by season
Southsea East: sample results by season (colony-forming units per 100 ml)
SeasonSamplesE. coli medianE. coli highestIntestinal enterococci medianIntestinal enterococci highestDiscountableAnnual class
20262018890142305Not yet published
20252059960275403Poor
202420321,200104901Poor
202320272,000183,7000Poor
202220322,800271,6000Sufficient
20212027710414200Good
202034605702604600—
20192010170101300Excellent
20182010490101640Excellent
201720102,100101360Excellent

Eastney

101001,00010,000‘Good’ limit 500 (a percentile, not one sample)2023202420252026

Each dot is one sample day. Hollow dots are below the laboratory detection limit (shown at the lowest tick). Official profile and live status ↗

Table of results by season
Eastney: sample results by season (colony-forming units per 100 ml)
SeasonSamplesE. coli medianE. coli highestIntestinal enterococci medianIntestinal enterococci highestDiscountableAnnual class
202620109110360Not yet published
20252010150103500Good
202420107310450Good
20231018690462,8000Good
2022101010010550Excellent
20212010350102700Excellent
2020391410551900—
2019201030010370Excellent
2018510<1010<100Excellent
20175101810180Excellent
Nearby beaches on Hayling Island (Havant, not Portsmouth)

Hayling Eastoke

101001,00010,000‘Good’ limit 500 (a percentile, not one sample)2023202420252026

Each dot is one sample day. Hollow dots are below the laboratory detection limit (shown at the lowest tick). Official profile and live status ↗

Table of results by season
Hayling Eastoke: sample results by season (colony-forming units per 100 ml)
SeasonSamplesE. coli medianE. coli highestIntestinal enterococci medianIntestinal enterococci highestDiscountableAnnual class
2026101045102600Not yet published
20251010120103500Excellent
20241010<1010180Excellent
20231010440101,4000Excellent
202210101,90010270Excellent
20212010<1010180Excellent
2020310140102600—
2019201082102100Excellent
2018510<1010<100Excellent
2017510<1010<100Excellent

Hayling Beachlands Central

101001,00010,000‘Good’ limit 500 (a percentile, not one sample)2023202420252026

Each dot is one sample day. Hollow dots are below the laboratory detection limit (shown at the lowest tick). Official profile and live status ↗

Table of results by season
Hayling Beachlands Central: sample results by season (colony-forming units per 100 ml)
SeasonSamplesE. coli medianE. coli highestIntestinal enterococci medianIntestinal enterococci highestDiscountableAnnual class
202610103610270Not yet published
20251010250104600Excellent
20241010<1010<100Excellent
20231010500106600Excellent
202210101810180Excellent
202120101810<100Excellent
202031045551200—
2019201064102300Excellent
2018510<1010<100Excellent
2017510<1010<100Excellent

Hayling Beachlands West

101001,00010,000‘Good’ limit 500 (a percentile, not one sample)2023202420252026

Each dot is one sample day. Hollow dots are below the laboratory detection limit (shown at the lowest tick). Official profile and live status ↗

Table of results by season
Hayling Beachlands West: sample results by season (colony-forming units per 100 ml)
SeasonSamplesE. coli medianE. coli highestIntestinal enterococci medianIntestinal enterococci highestDiscountableAnnual class
20261010<1010180Not yet published
202510101810820Excellent
20241010<1010<100Excellent
20231010520109700Excellent
202210101810450Excellent
202120101810180Excellent
20203102718550—
20192010150108900Excellent
20185104510<100Excellent
2017510<1010<100Excellent

Percentile of the last four seasons of samples. Excellent and Good use the 95th percentile, Sufficient the 90th percentile. Environment Agency: how bathing water is classified ↗

Shellfish beds in Portsmouth and Langstone harbours: current classification
HarbourBedSpeciesClassWhat it means
Langstone HarbourLangstone ChannelNative oystersBMust be purified, relaid or cooked before sale
Langstone HarbourLangstone ChannelPacific oystersBMust be purified, relaid or cooked before sale
Langstone HarbourSouth East Langstone HarbourHard clamsB-LTClass B, long-term (designation being phased out from October 2026)
Portsmouth HarbourEast HarbourHard clamsB-LTClass B, long-term (designation being phased out from October 2026)
Portsmouth HarbourEast HarbourNative oystersB-LTClass B, long-term (designation being phased out from October 2026)
Portsmouth HarbourEast HarbourPacific oystersB-LTClass B, long-term (designation being phased out from October 2026)
Portsmouth HarbourFareham LakeHard clamsB-LTClass B, long-term (designation being phased out from October 2026)
Portsmouth HarbourFareham LakeNative oystersC/Time Limited ProhibitionClass C, with harvesting prohibited for a set period. Prohibited 1-30 September, Class C from 1 November - 31 August (subject to additional sampling in October)
Portsmouth HarbourFareham LakePacific oystersC/Time Limited ProhibitionClass C, with harvesting prohibited for a set period. Prohibited 1-30 September, Class C from 1 November - 31 August (subject to additional sampling in October)
Portsmouth HarbourFareham Lake MiddleNative oystersBMust be purified, relaid or cooked before sale
Portsmouth HarbourFareham Lake MiddlePacific oystersBMust be purified, relaid or cooked before sale
Portsmouth HarbourPaulsgrove and PortchesterCarpet clamsCMust be relaid for a long period or cooked before sale
Portsmouth HarbourPaulsgrove and PortchesterCocklesCMust be relaid for a long period or cooked before sale
Portsmouth HarbourWest HarbourHard clamsB-LTClass B, long-term (designation being phased out from October 2026)
Portsmouth HarbourWest HarbourNative oystersB-LTClass B, long-term (designation being phased out from October 2026)
Portsmouth HarbourWest HarbourPacific oystersB-LTClass B, long-term (designation being phased out from October 2026)

Classes describe how shellfish must be treated before sale, based on E. coli monitoring by Portsmouth Port Health Authority. Classifications run 1 December to 30 November and can change during the year. No bed in either harbour is Class A. Source: Shellfish classification list and sampling plans ↗, Updated: 01 October 2026.

What’s being done, and who pays

Official commitments on sewage and water quality, with their original decision, dated progress and funding where the record states it.

Committed by Southern Water Not verified

PR24 Water Industry National Environment Programme

Reduce spills from the Pier Road, Southsea storm overflow with sustainable drainage and storage (WINEP action 08SO103210a).

ApprovedFundedUnder wayCompleted

No dated evidence of progress has been found; stages are shown hatched.

Who pays, key dates and what is missing

Funded by: not stated in the record.

Made 5 March 2025 · due 30 June 2027 · PR24 Water Industry National Environment Programme (WINEP) national dataset ↗

Committed by Southern Water Not verified

PR24 Water Industry National Environment Programme

Reduce spills from the Gladys Avenue, Portsmouth storm overflow with storage, sustainable drainage preferred (WINEP action 08SO103263a).

ApprovedFundedUnder wayCompleted

No dated evidence of progress has been found; stages are shown hatched.

Who pays, key dates and what is missing

Funded by: not stated in the record.

Made 5 March 2025 · due 30 June 2027 · PR24 Water Industry National Environment Programme (WINEP) national dataset ↗

Committed by Southern Water Not verified

PR24 Water Industry National Environment Programme

Reduce spills from the Henderson Road, Eastney storm overflow with sustainable drainage and storage (WINEP action 08SO103190a).

ApprovedFundedUnder wayCompleted

No dated evidence of progress has been found; stages are shown hatched.

Who pays, key dates and what is missing

Funded by: not stated in the record.

Made 5 March 2025 · due 31 March 2035 · PR24 Water Industry National Environment Programme (WINEP) national dataset ↗

Committed by Southern Water Not verified

PR24 Water Industry National Environment Programme

Investigate the causes of poor water quality at the Southsea East bathing water (WINEP action 08SO101010a).

ApprovedFundedUnder wayCompleted

No dated evidence of progress has been found; stages are shown hatched.

Who pays, key dates and what is missing

Funded by: not stated in the record.

Made 5 March 2025 · due 30 April 2027 · PR24 Water Industry National Environment Programme (WINEP) national dataset ↗

Committed by Portsmouth City Council In progress

Southsea Coastal Scheme

Build new flood defences along 4.5 km of Southsea seafront, from Old Portsmouth to Eastney, in six frontages.

ApprovedFundedUnder wayCompleted

Status evidence, 19 October 2026: Southsea Coastal Scheme booklet, October 2026 ↗

Who pays, key dates and what is missing

Funded by: not stated in the record.

Made October 2024 · due 2028 · £180,000,000 (The booklet gives the scheme cost as more than £180m; not a final outturn) · Southsea Coastal Scheme booklet, October 2026 ↗

4 dated records
  1. 17 March 2023 output Frontage 1 (Long Curtain Moat) officially opened. source ↗
  2. May 2024 output Frontage 4 (Southsea Castle) opened. source ↗
  3. 19 December 2024 output Frontage 5 West (Pyramids to Speakers’ Corner) opened. source ↗
  4. 2 April 2026 output Frontage 3 (Southsea Common) opened. source ↗

Committed by Portsmouth City Council In progress

North Portsea Coastal Scheme

Complete phase 5, the final phase of the North Portsea Coastal Scheme, at Ports Creek and Hilsea Lines.

ApprovedFundedUnder wayCompleted

Status evidence, 23 October 2026: Our final chapter begins as most of last phase opens ↗

Who pays, key dates and what is missing
Funded by
  • Funded by Environment Agency Amount not stated · Flood defence grant

Made October 2024 · due 2027 · Corporate Plan 2024-2026 (Council Plan 2024) ↗

1 dated record
  1. 23 October 2026 output Large parts of Ports Creek and Hilsea Lines opened; work continues around Peronne Road Bridge, with full completion expected in autumn 2027. source ↗

Committed by Portsmouth City Council Not verified

Corporate Plan 2024-2026

Continue to lobby and work with partners to improve air and water quality and city biodiversity.

ApprovedFundedUnder wayCompleted

No dated evidence of progress has been found; stages are shown hatched.

Who pays, key dates and what is missing

Funded by: not stated in the record.

Made October 2024 · due 2026 · Corporate Plan 2024-2026 (Council Plan 2024) ↗

3 dated records
  1. 21 July 2026 outcome Carbon Action Plans reported to Cabinet for information: council emissions of 7,885 tonnes CO2e in 2024/25, Scope 1 and 2 about 60% below 2012/13; city emissions down 52% since 2005. source ↗
  2. 1 October 2026 outcome Air quality annual status report (information only): in 2025 one diffusion tube exceeded the annual nitrogen dioxide limit (Alfred Road, 41.86 µg/m³, kerbside, not a place of relevant public exposure, so no new management area); 225 of 228 tubes show a downward trend over 2021-2025. source ↗
  3. 10 November 2026 output The council’s water quality page describes two solar-powered LED signs on Eastney seafront, red if sewage was released in the last 48 hours, Environment Agency warning signs at Southsea East, and Yellow Fish drain markers, working with Southern Water and the Environment Agency. source ↗

Committed by Portsmouth City Council scrutiny panel In progress

Scrutiny review: sewage discharges into the sea

Review sewage discharges into the sea around Portsmouth, taking evidence from Southern Water, the Environment Agency, the University of Portsmouth, campaign groups and Cabinet members, and report recommendations.

ApprovedFundedUnder wayCompleted

Status evidence, 3 November 2026: Traffic, Environment and Community Safety Scrutiny Panel, 3 November 2026: agenda ↗

Who pays, key dates and what is missing

Funded by: not stated in the record.

Made 16 July 2026 · Traffic, Environment and Community Safety Scrutiny Panel, 16 July 2026: minutes ↗

3 dated records
  1. 7 September 2026 milestone Southern Water, the Environment Agency and the University of Portsmouth gave evidence. Southern Water said 43 projects across Portsmouth aim to remove about 50 hectares of hard surface draining to sewers, ten completed, and that the Western Interceptor extension is at design stage, due to start in January 2028. source ↗
  2. 5 October 2026 milestone The Final Straw Foundation gave evidence, asking for more frequent testing at more locations, faster results and measurable targets. Action recorded: a meeting between the foundation and Southern Water, with no date set. source ↗
  3. 3 November 2026 milestone Cabinet members for climate change and for community safety gave evidence; a local resident’s written views were published. Minutes not yet published. source ↗

Committed by Portsmouth City Council Not verified

Surface Water Management Plan

Reduce surface water flood risk in the fourteen hotspot areas identified in the Surface Water Management Plan (September 2025 update).

ApprovedFundedUnder wayCompleted

No dated evidence of progress has been found; stages are shown hatched.

Who pays, key dates and what is missing

Funded by: not stated in the record.

Made September 2025 · Flood protection policies: Surface water flooding ↗

Committed by Hampshire County Council Not verified

Local Nature Recovery Strategy for Hampshire

Set priorities for nature recovery across Hampshire, including Portsmouth and Southampton, out to mean low water.

ApprovedFundedUnder wayCompleted

No dated evidence of progress has been found; stages are shown hatched.

Who pays, key dates and what is missing

Funded by: not stated in the record.

Made November 2025 · Local Nature Recovery Strategy for Hampshire 2025, Part 1 ↗

Committed by Portsmouth City Council In progress

Nutrient Neutral Mitigation Strategy

Require new homes to be nutrient neutral, so that wastewater from development does not add nitrates to the Solent, using mitigation credits under a section 111 agreement.

ApprovedFundedUnder wayCompleted

Status evidence, 10 November 2026: Nitrate mitigation strategy ↗

Who pays, key dates and what is missing

Funded by: not stated in the record.

Made June 2022 · Nitrate mitigation strategy ↗

Committed by Southern Water Not verified

PR24 Water Industry National Environment Programme

Cut spills from the Budds Farm, Havant storm overflow (permit A00751) into Langstone Harbour to fewer than 10 a year, with sustainable drainage and storage, to protect shellfish waters (WINEP action 08SO103182a).

ApprovedFundedUnder wayCompleted

No dated evidence of progress has been found; stages are shown hatched.

Who pays, key dates and what is missing
Funded by
  • Funded by Southern Water (customer bills, under Ofwat’s 2024-2030 price limits) Amount not stated · No Budds Farm cost is published; Southern Water’s 2023 business case puts its whole 2024-2030 storm overflow programme at £682m

Made 17 January 2025 · due 31 March 2030 · PR24 Water Industry National Environment Programme (WINEP) national dataset ↗

What Facts Count suggests

Suggestions, not decisions. None is costed.

Proposed by Facts Count

Ask for the volumes, outfall by outfall

Spill monitors record how long an overflow discharged, not how much. Ask Southern Water and the Environment Agency, under the Environmental Information Regulations, for any flow or volume records they hold for each outfall around Portsmouth: dates, units, whether measured or modelled, how complete the data is, and which outfalls have no measurement at all.

Who: Anyone can ask; Facts Count has drafted a request (not yet sent). Gap it answers: Volume is not published for any outfall in these waters.

Proposed by Facts Count

Give the scrutiny review dates and owners

When the scrutiny panel reports, each recommendation should name the body responsible, a baseline, a measurable target and a date for a written response, with a follow-up meeting to check progress. Campaigners asked for the same at the 5 October session.

Who: Portsmouth City Council scrutiny panel, Southern Water, Environment Agency Gap it answers: No recommendations, responses or follow-up dates have been published yet.

Proposed by Facts Count

Show spills and beach samples side by side each season

Publish, for each bathing water, the overflows that discharge nearby and the season’s sample results together, labelled as an association, not proof of cause, so residents can see whether the schemes are making a difference where people swim.

Who: Facts Count will do this on this page as each season’s data is published. Gap it answers: Sample-by-sample matching is not yet built.

Proposed by Facts Count

Connect water-company work to beach water results

Publish a dated, outfall-by-outfall record linking each Portsmouth storm overflow's spills to its regulated improvement deadline and progress.

EstimateAllocatedSpentUnknown

Proposed lead: Southern Water (proposed) for delivery reporting, with Portsmouth City Council (proposed) hosting the joined-up local record

First step: The outfall table in this plan can be published now from public data.

Issue: Sewage spills and flood defences

How it’s monitored

Checked every week: new or revised annual spill returns, new monthly start and stop records, bathing water results in season, shellfish classifications, and new council papers on sewage. Changes go to a review queue; figures change on this page only after review.

Live status is not shown yet. A near-real-time overflow status feed exists (Southern Water’s Rivers and Seas Watch, and Water UK’s national hub), but its reuse terms and how it shows offline or stale monitors have not yet been tested, so live status is not shown here. Use the operator’s map for today’s status. Southern Water: Rivers and Seas Watch ↗ · Water UK: National Storm Overflow Hub ↗

Which evidence is included

  • Storm-overflow discharge counts and duration Included
    Environment Agency Event Duration Monitoring annual returns 2020 to 2025, supplied by water companies.
  • Bathing-water sample results Included
    In-season samples with E. coli and intestinal enterococci counts.
  • Annual bathing-water classifications Included
  • Official pollution incidents Not included yet
    No dated, located and severity-classified Portsmouth incident file has been verified for publication, so none is shown. An empty map would wrongly read as no incidents.
  • Water-body ecological status Not included yet
    Not added yet. It would be a multi-year assessment, not a live reading, and needs its own assessment period and water-body boundaries.
  • Southern Water scheme and operational records Kept separate
    Company records are a different kind of source and are kept with the official commitments, not mixed with Environment Agency measurements.

Live advice is not cached here. Daily pollution-risk forecasts and any temporary advice change within hours. They are not cached here. Bathing water profile: Southsea East (live status and advice) ↗ · Environment Agency: find any bathing water and its live status ↗

Method, scope and sources
  • A sample result is one measured day, not an annual classification.
  • The annual classification uses four seasons of samples and is reported by the Environment Agency.
  • Samples the Environment Agency marks discountable (abnormal situations) are kept and labelled.
  • A missing result is not zero. A result with a "<" qualifier is below the laboratory detection limit shown.
  • A recorded discharge, a measured result and harm to health are three different things. No illness count is available for Portsmouth beaches and none is shown.
  • This is stored annual data. It is not live swimming advice: use the live source for today.

Site register: 48 placed outfalls, 0 failing coordinate checks. Each placed outfall and each sampling point must lie in the Solent box and agree with its grid reference to within 3 km (a gross-error check, not a full datum transform). Outfalls are grouped by the receiving water named in the return. Harbour and Southsea outfalls outside the council boundary are context, and an outfall near a beach does not by itself show it polluted that beach.

  • Counted spills use the Environment Agency’s 12/24-hour counting method, so one long event can count as several spills.
  • Hours are outfall-hours: durations are added across outfalls, which can spill at the same time, so the total is not clock time.
  • A missing reading is not zero. Years where an outfall is not listed, or its spill count is blank, are shown as gaps.
  • Monitoring coverage (share of the year the monitor worked) is shown for each outfall and year; low coverage means spills can be under-counted.
  • The consistent-site series uses only outfalls with a spill count in every year, so changes in how many outfalls were monitored do not drive the trend.
  • The returns record how long overflows discharged, not how much. Volume is not published for these outfalls.
  • A spill and a poor water sample nearby do not by themselves show that one caused the other.

Scope. An outfall is placed by the receiving water named in its latest return (and, for “The Solent”, by its outlet grid reference). Outfalls whose receiving water does not demonstrably drain to these waters are left out of the Portsmouth totals and listed for review.

  • Portsmouth Harbour: Portsmouth Harbour, The Portsmouth Harbour, Trib Of Portsmouth Harbour, Fareham Creek/Portsmouth Hbr, Frater Lake, Frater Lake, Portsmouth Hbr, Workhouse Lake, Workhouse Lake, Portsmouth Hbr, Ports Creek, River Wallington, Wallington River, Wallington River Via Drain, Tributary Of River Wallington, Unnamed Trib Of R. Wallington
  • Langstone Harbour: Langstone Harbour, Broom Channel, Great Salterns Lake, Hermitage Stream, Brockhampton Creek
  • Southsea and Eastney coast: The Solent/Langstone Harbour, The Solent

Download: discharge figures (JSON) · bathing-water results (JSON) · outfalls by year (CSV).