Somers Orchard, Somerstown

566 homes. Permission granted. Somerstown: former Horatia and Leamington towers, Melbourne Place car park, Gibson Centre site.

Permission grantedRental homes (not for sale)

1 · What is planned

Homes and stage

319 affordable homes in three buildings plus up to 247 build-to-rent homes. These replace homes lost, so they are not the net increase.

Derived: 566 planned minus the 272 socially rented homes the council says it will replace. Not a council figure.

Where it stands: Committee approval August 2024 (council page); decision notices issued 2 December 2025 (planning register, reported). In February 2026 the council began seeking a first-phase contractor, aiming for completion by 2030. First-phase construction expected 2027 (reported).

Planning (23/01574/FUL (affordable) and 23/01575/FUL (build-to-rent)): Conditional permissions dated 2 December 2025 (reported). The record confirms what is permitted, not that facilities are built. Reference reported from the council register, which blocks scripted access.

2 · Can I buy?

First-time buyers

A rental scheme: council social-rent homes and a build-to-rent block. Not a buying opportunity; it relieves pressure on the waiting list and temporary accommodation.

Developer or council page ↗

Affordable and social homes

At least 272 homes for social rent, matching the number lost from the towers; these are within the 319 affordable, not additional. First phase 175 council homes for social rent (Cabinet report, reported).

Remaining tenure mix of the 319 not confirmed.

The gap to buying and the schemes that help →

3 · Who is involved

Developer, builder and land

Developer
Portsmouth City Council (housing revenue account) for the affordable homes; a partner is being sought for build-to-rent
Builder
First-phase contractor being sought
Who sells or lets
Not for sale: council homes for social rent; the build-to-rent block is rental
Land
Council-promoted; ownership of the three related sites should be confirmed. Reported

Public money: A July 2025 account described a £120 million scheme partly financed by selling council land for the build-to-rent block, with applications split to access Homes England grant. These are 2025 intentions and estimates; the current budget, sale price, grant and borrowing are not verified. Reported

4 · Roads, schools and doctors

What comes with the homes

“Proposed” means part of the scheme or application. “Not found” means no secured obligation could be verified, not that none exists.

  • Community and commercial space proposed Replacement community space, commercial space, play space, parking, drainage and street changes are part of the permissions (reported).
  • Schools Not found No school, SEND or GP obligation verified.
  • SEND places Not found Not verified.
  • GP and health Not found Not verified.
  • Parking proposed Parking is part of the permissions; counts not verified.

5 · Energy

Heating and solar

A July 2025 account says all 566 homes were designed to Passivhaus standard with a unit-based heat-pump and ventilation strategy. A design statement, not certification or Future Homes Standard evidence; rooftop solar not verified.

The Future Homes Standard regulations are due to come into force on 24 March 2027 with transitional arrangements; whether they apply to a building depends on its building-control application and commencement dates. Solar panels, heat pumps or an A-rated certificate do not by themselves show compliance, and compliance does not require a heat pump in every flat.

The council’s Local Plan view

Ownership, constraints and open questions

Ownership
The council housing revenue account is the promoter in its March 2026 statement; check ownership of the three related sites.
Proposal
The council describes 566 proposed homes: 319 affordable and up to 247 build-to-rent. The scheme replaces previous homes, so this is not the net increase.
Status
The council says the applications were approved and it was seeking a first-phase contractor in February 2026, with an aim for first-phase completion by 2030.
Constraints
Contractor appointment, funding and the timetable for both phases need current confirmation.
Open question
Has a contractor been appointed and how many net additional, affordable and occupied homes are expected in each phase?

Portsmouth City Council, Somers Orchard overview ↗

Evidence

What each statement rests on

Still missing

  • Contractor, current budget, grant award and borrowing.
  • Land-sale price and any retained council interest in the build-to-rent land.
  • School, SEND and GP obligations.
  • Net additional homes by phase.